The Student News Site of Texas A&M University - College Station

The Battalion

The Student News Site of Texas A&M University - College Station

The Battalion

The Student News Site of Texas A&M University - College Station

The Battalion

Scenes from 74
Scenes from '74
April 25, 2024
Junior G Wade Taylor IV (4) covers his face after a missed point during Texas A&Ms game against Arkansas on Feb. 20, 2024 at Reed Arena. (Jaime Rowe/The Battalion)
When it rains, it pours
February 24, 2024
Ali Camarillo (2) waiting to see if he got the out during Texas A&Ms game against UIW on Tuesday, Feb. 20, 2024 at Olsen Field. (Hannah Harrison/The Battalion)
Four for four
February 20, 2024
Advertisement
Photo Courtesy of Maddie Pearson
For the love of birds: Students unite to protect migratory species
J. M. Wise, News Reporter • April 25, 2024

The deadliest building on campus for birds is one dedicated to studying them. At least 23 birds this year have been killed from window collisions...

Advertisement
Texas A&M infielder Koko Wooley (3) swings at the ball during Texas A&M’s game against Houston at Davis Diamond. on Tuesday, April 23, 2024. (Rocio Salgado/ The Battalion)
Lights, camera, action
Hunter Mitchell, Associate Sports Editor • April 25, 2024

Thirty-two wins in 2021, eight in conference play. Thirty-one wins in 2022, six in conference play. Thirty-five wins in 2023, 12 in conference...

Advertisement
Kenedy White wears the clothes she wore the night of her alleged assault. (Ishika Samant/The Battalion)
Incoming Blinn transfer recounts her Title IX experience
Nicholas Gutteridge April 25, 2024

Editor’s note: This article contains detailed descriptions of sexual assault that may be uncomfortable to some readers. Reader discretion is...

Scenes from 74
Scenes from '74
April 25, 2024
Advertisement
Texas A&M professor Dr. Christina Belanger teaches her Geology 314 class on Wednesday, April 3, 2024, in the Halbouty Geosciences Building. (CJ Smith/The Battalion)
Opinion: Stop beating the dead [virtual] horse
Eddie Phillips, Opinion Writer • April 22, 2024

Snow days were my favorite days of grade school. I would wake up extra early to stand in my living room to peer through the glass toward the...

Zachry reactor stays despite renovation

FILEA+nuclear+reactor+remains+in+Zachry+as+renovation+projects+begin+around+it.

FILE

A nuclear reactor remains in Zachry as renovation projects begin around it.

Construction crews that plan to tackle the Zachry Engineering Center’s renovation will have an unusual feature at their worksite — an operational nuclear reactor.
Construction will begin over spring break to renovate Zachry into the Engineering Education Complex. To prepare for the upcoming construction, Zachry had to be emptied of all personnel and equipment. The reactor housed in Zachry will remain intact and operational during the construction process but will not be in use. Safety precautions will be in place to ensure the reactor’s stability, and police will guard the reactor every night, said engineering administration officials.
Before the building construction, the nuclear reactor inside was used to teach students about operational materials and safety techniques.
“The nuclear reactor is a five watt reactor that has about enough power to power a light bulb, but nevertheless it is a nuclear reactor,” said Tell Butler, manager of engineering facilities.
Butler said the university will take every precaution to safeguard the reactor. A special utility system will be put in place to ensure the reactor has the same level of stability and power that it had when the building was fully operational. Access to the reactor area will be restricted to the nuclear reactor supervisor, a federal nuclear commission agency and a group of consultants hired to look after the area. The reactor area will also be under video surveillance in addition to being guarded by police at night.
The reactor is the only piece of equipment to remain in Zachry as construction crews ready for the eventual renovation. All other pieces of equipment have been removed from the building and taken to new locations, Butler said.
“To move that equipment appropriately, we brought in the manufacturers of that equipment and they actually disassembled it, packed it for moving and when we put it in the new locations they came in and reassembled it,” Butler said.
All of the pieces of equipment moved out of Zachry will remain in their new locations, Butler said, and new equipment will be brought in for the Engineering Education Complex when it is completed. Much of the equipment that has been removed from Zachry is mainly used by graduate students, but the Engineering Education Complex will focus on undergraduate education. The new equipment that will be brought in will be smaller scale, simulation-based equipment Butler said.
Butler said the process of emptying Zachry for construction has been ongoing for nearly a year but was completed in the first week of February. Zachry’s renovation into the Engineering Education Complex will begin during spring break with the abatement of any hazardous materials, such as asbestos.

Leave a Comment
Donate to The Battalion

Your donation will support the student journalists of Texas A&M University - College Station. Your contribution will allow us to purchase equipment and cover our annual website hosting costs.

More to Discover
Donate to The Battalion

Comments (0)

All The Battalion Picks Reader Picks Sort: Newest

Your email address will not be published. Required fields are marked *